From official state and federal legislative records. Informational only, not legal advice.
Now law
This is now an official law, recorded in the state's law books.
The governor signed it. Nothing left to watch.
In plain words
AI summaryWritten by AI from the bill text. Check the official text before relying on it.
Digest: Allows the use of a third party to study or evaluate a request to connect a microgrid to a power grid. (Flesch Readability Score: 60.6). Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid. Allows a contracted third-party consultant to receive from a public utility all technical data necessary to conduct the study or engineering evaluation and submit to the public utility a preliminary design for review. Requires a public utility to approve or deny an application based on safety, reliability and compliance with published standards. Takes effect on the 91st day following adjournment sine die.